Noi Bai industrial zone
Noi Bai industrial zone: Noi Bai industrial zone was developed by Noi Bai development company, a joint venture company between Renon (Malaysia) and Ha Noi industrial construction company.
Noi Bai industrial zone project
Noi Bai industrial zone: Noi Bai industrial zone was developed by Noi Bai development company, a joint venture company between Renon (Malaysia) and Ha Noi industrial construction company.
Noi Bai industrial zone: Noi Bai industrial zone was developed by Noi Bai development company, a joint venture company between Renon (Malaysia) and Ha Noi industrial construction company.
Project description
- Investment form: Joint venture
+ Vietnam Party: Ha Noi industrial construction
+ Foreign Party: Renong company-Malaysia
- Established under the Investment License No. 839 / GP issued by the Ministry of Planning and Investment in Viet Nam on 04/12/1994.
- Total investment capital for infrastructure construction: $ 29,950,000
- Legal capital: $ 11,667,000
- Vietnam Party: 30%
- Foreign party: 70%
- Project Area: 100 hectares and be developed in two stages.
Stage 1 (50 ha) is currently 50% leased.
Stage 2 (50 ha) is implementing the technical infrastructure construction.
- The size of the flexible batch: Noi Bai Industrial Zone is very flexible to meet the different soil needs and can choose the batch size from 0,25 to 1 hectare. You can lease in the adjacent plots if necessary.
+ Internal area has 2 entries ịn and out of industrial zone. The road system in the area is completely planned.
+ Outside: It can be reached via the Soc Son road (Route 13) to national road No. 3.
- Electricity: Substation 110kV / 220kV, 40MVA capacity.
- Water supply: 7500 m3 / 24h.
-Contact Information: 2000 lines, fiber optic telephone lines.
- Wastewater treatment system: wastewater treatment system using modern biological treatment methods.
- Manufacturing fields in the industrial park:
+ Mechanical industry
+ Electronics industry.
+ Accurate industry
+ Light industry
+ Information technology
- Land use term: Up to 2044.
- The number of investment projects for building: 6 projects
- Operating time: 50 years
Source: khukinhte
(khukinhte)